Tag: Rhyal Engineering

  • CASE STUDY – Hinkley Point A

    CASE STUDY – Hinkley Point A

    Member: Rhyal Engineering

    Project: DCICCS Connection Devices Type CD1 and CD2

    Capability: Specialist Engineering

    Client: Magnox

    Location: Hinkley Point A

    Contract: Design, Build & Associated Works

    Rhyal Engineering has established a strong reputation for delivering specialist engineered solutions to some of the UK’s most highly regulated industries, including the nuclear, energy and industrial sectors. Combining advanced design capabilities with precision fabrication and manufacturing expertise, the company is trusted to deliver bespoke equipment and systems where safety, quality and reliability are paramount.

    A notable example of this capability is Rhyal Engineering’s delivery of the DCICCS Connection Devices Type CD1 and CD2 project for Magnox at Hinkley Point A.

    The project formed part of Phase 1 of the Settling Tank 1, 2 and 3 Inventory Relocation Project, a key programme designed to safely transfer intermediate-level waste from storage tanks into specially designed Ductile Cast Iron Containers for long-term storage and management.

    Rhyal Engineering was appointed to undertake the full design, build and associated works package for the bespoke Ductile Cast Iron Container Connection System (DCICCS) Connection Devices. These critical components form part of the waste transfer system and are responsible for controlling the safe filling of the containers during transfer operations.

    Manufactured from 316 stainless steel, the connection devices are designed to interface directly with the Ductile Cast Iron Containers while operating within a highly controlled nuclear environment. During the transfer process, intermediate-level waste is pumped from the settling tanks using peristaltic pumps capable of operating at pressures of up to 15 bar, requiring robust and precisely engineered components to ensure safe and reliable performance.

    The CD1 Connection Device functions as the fill head, enabling the controlled transfer of waste into the containers. Working alongside this, the CD2 Connection Device acts as the service head and incorporates an integrated camera system and high-level trip mechanism, providing both operational monitoring and additional safety assurance throughout the filling process.

    The project demanded exceptional attention to detail, rigorous quality control and strict compliance with nuclear industry standards. From design and fabrication through to testing and final delivery, Rhyal Engineering worked to exacting specifications to ensure the equipment met the performance, safety and reliability requirements of the wider inventory relocation programme.

    The successful completion of the DCICCS Connection Devices project demonstrates Rhyal Engineering’s capability to deliver complex specialist engineering solutions for critical nuclear infrastructure. It highlights the company’s expertise in precision design and manufacture, reinforcing the depth of technical capability represented within the Celtico alliance.

    For more information about Rhyal Engineering, click here

  • CASE STUDY – SHOWCASING OUR MEMBER: RHYAL ENGINEERING

    CASE STUDY – SHOWCASING OUR MEMBER: RHYAL ENGINEERING

    Member: Rhyal Engineering

    Project: Bio Ethanol Implementation

    Capability: Turnkey

    Client: BP

    Location: Various UK Fuel Supply Terminals

    Value: £25.3 million+

    Established in 1998, Rhyal Engineering has grown to become one of the UK’s leading specialist storage tank and mechanical engineering contractors, delivering complete design, fabrication, construction and commissioning solutions across the oil and gas, nuclear, renewable and bulk storage sectors. Operating from its extensive fabrication facilities in Milford Haven, the company has built a strong reputation for delivering complex, large-scale engineering projects safely and efficiently across the UK and overseas.

    A standout example of this capability is Rhyal Engineering’s delivery of a major Bio Ethanol Implementation programme for BP, valued at more than £25.3 million. Delivered across four fuel supply terminals throughout England, the project formed a significant part of wider infrastructure upgrades designed to support the integration of biofuels into the UK fuel distribution network.

    Rhyal Engineering was responsible for the full turnkey delivery of the project, managing every phase from detailed design and engineering through to supply, fabrication, construction and final commissioning. The scope included the installation of complete biofuels blending process systems and associated mechanical infrastructure, designed to meet stringent operational and regulatory requirements.

    The works involved the supply and installation of blending tanks manufactured to BS EN 14015 standards, together with pumps, process pipework and associated structural steelwork. In addition to the core mechanical package, Rhyal delivered all associated civil works, electrical installation and instrumentation systems required to integrate the new infrastructure into live operational fuel terminal environments.

    Delivering simultaneous works across multiple active fuel terminals required exceptional project coordination, technical planning and strict adherence to health, safety and environmental standards. Rhyal Engineering’s multidisciplinary teams worked closely with BP and site stakeholders to ensure minimal operational disruption while maintaining programme certainty across all locations.

    The successful completion of this major programme demonstrates Rhyal Engineering’s proven ability to deliver complex turnkey engineering solutions at scale. It highlights the company’s specialist expertise in bulk storage infrastructure, process systems integration and large-scale mechanical construction, reinforcing the depth of capability represented within the Celtico alliance.

  • CASE STUDY – RHYAL ENGINEERING IN MILFORD HAVEN

    CASE STUDY – RHYAL ENGINEERING IN MILFORD HAVEN

    Member: Rhyal Engineering

    Project: Berth 2 Rationalisation & Header Manifold

    Capability: Pipework Fabrication & Installation

    Client: Confidential

    Location: Milford Haven

    Contract: Design, Build & Associated Works

    Established in 1998, Rhyal Engineering has developed a strong reputation for delivering specialist mechanical engineering, fabrication and installation services across the UK’s energy and industrial sectors. With extensive experience operating within live fuel storage and marine terminal environments, the company is recognised for its ability to safely deliver technically complex projects where operational continuity is critical. Its fabrication facilities and highly skilled site teams enable Rhyal to provide complete design-and-build solutions for demanding infrastructure upgrades.

    A strong example of this expertise is Rhyal Engineering’s delivery of the Berth 2 Rationalisation & Header Manifold project at a major oil terminal in Milford Haven.

    The project involved critical upgrade works to the terminal’s marine loading facility, where the client required the rationalisation of the over-water pipe-track infrastructure serving Berth 2. The works were designed to improve operational efficiency, modernise key pipework systems and ensure the continued safe and reliable operation of the berth.

    Rhyal Engineering was appointed to undertake the full design, build and associated works package, delivering a complete pipework fabrication and installation solution within a highly sensitive live operational environment.

    The scope included the removal of redundant pipework lines and the uprating of the remaining in-service lines extending from the jetty head gate through to the root of the berth. In parallel, Rhyal delivered a full upgrade of the jetty head manifold system, involving the fabrication, testing and installation of new manifold sections before final pressure testing and handover.

    Given the operational importance of the berth, delivery required a carefully phased and highly coordinated approach. The project was executed in staged sections to allow installation of the upgraded manifold components while minimising disruption to terminal operations and maintaining berth availability throughout the programme.

    Working within a marine loading environment presented significant technical and logistical challenges, requiring strict adherence to safety procedures, precise planning and close coordination with terminal operations teams. Rhyal Engineering’s ability to manage fabrication, testing and installation seamlessly ensured the successful delivery of the project to programme.

    The successful completion of the Berth 2 Rationalisation & Header Manifold project highlights Rhyal Engineering’s capability to deliver complex pipework infrastructure upgrades safely and efficiently within live operational energy facilities, demonstrating once again the specialist expertise and delivery strength represented within the Celtico alliance.