Member: Rhyal Engineering
Project: DCICCS Connection Devices Type CD1 and CD2
Capability: Specialist Engineering
Client: Magnox
Location: Hinkley Point A
Contract: Design, Build & Associated Works
Rhyal Engineering has established a strong reputation for delivering specialist engineered solutions to some of the UK’s most highly regulated industries, including the nuclear, energy and industrial sectors. Combining advanced design capabilities with precision fabrication and manufacturing expertise, the company is trusted to deliver bespoke equipment and systems where safety, quality and reliability are paramount.
A notable example of this capability is Rhyal Engineering’s delivery of the DCICCS Connection Devices Type CD1 and CD2 project for Magnox at Hinkley Point A.
The project formed part of Phase 1 of the Settling Tank 1, 2 and 3 Inventory Relocation Project, a key programme designed to safely transfer intermediate-level waste from storage tanks into specially designed Ductile Cast Iron Containers for long-term storage and management.
Rhyal Engineering was appointed to undertake the full design, build and associated works package for the bespoke Ductile Cast Iron Container Connection System (DCICCS) Connection Devices. These critical components form part of the waste transfer system and are responsible for controlling the safe filling of the containers during transfer operations.
Manufactured from 316 stainless steel, the connection devices are designed to interface directly with the Ductile Cast Iron Containers while operating within a highly controlled nuclear environment. During the transfer process, intermediate-level waste is pumped from the settling tanks using peristaltic pumps capable of operating at pressures of up to 15 bar, requiring robust and precisely engineered components to ensure safe and reliable performance.
The CD1 Connection Device functions as the fill head, enabling the controlled transfer of waste into the containers. Working alongside this, the CD2 Connection Device acts as the service head and incorporates an integrated camera system and high-level trip mechanism, providing both operational monitoring and additional safety assurance throughout the filling process.
The project demanded exceptional attention to detail, rigorous quality control and strict compliance with nuclear industry standards. From design and fabrication through to testing and final delivery, Rhyal Engineering worked to exacting specifications to ensure the equipment met the performance, safety and reliability requirements of the wider inventory relocation programme.
The successful completion of the DCICCS Connection Devices project demonstrates Rhyal Engineering’s capability to deliver complex specialist engineering solutions for critical nuclear infrastructure. It highlights the company’s expertise in precision design and manufacture, reinforcing the depth of technical capability represented within the Celtico alliance.