MII Engineering played a key role in the successful delivery of the Hirwaun Power Plant, a 299MW Open Cycle Gas Turbine (OCGT) peaking station developed to provide fast-response generation capacity to the UK electricity grid.
Owned by Drax and delivered by international EPC contractor Metlen Energy and Metals, the facility represents an important investment in UK energy resilience, helping to balance the grid as increasing levels of renewable generation are brought online. Located in the Cynon Valley, the station is designed to provide dispatchable power during periods of peak demand, supporting the UK’s transition towards a lower-carbon energy system.
Appointed by Metlen as Electrical Erection Subcontractor, MII Engineering was responsible for the complete electrical installation package across the facility, delivering works valued at £5.38 million.
The scope encompassed the full electrical infrastructure required to support the operation of the power station, from high-voltage systems through to instrumentation, control and life-safety systems. MII Engineering installed and energised high-voltage cable networks connecting the generator, generator transformer and auxiliary transformers, alongside the installation and commissioning of low-voltage switchgear, transformers, distribution boards, motor control centres and associated power distribution systems.
A significant element of the project involved the installation of the station’s Distributed Control System (DCS), the central control platform responsible for monitoring and operating all major plant systems. MII Engineering delivered the installation of control room cabinets, marshalling panels, field cabling, terminations and integration with the wider plant control architecture, ensuring seamless communication between operational systems across the facility.
The project also included the installation of extensive cable containment infrastructure, instrumentation systems, site-wide earthing and bonding networks, lightning protection interfaces, fire detection and alarm systems, CCTV, security and access control systems, heat tracing circuits, external lighting and utility power supplies.
Working within a safety-critical power generation environment required rigorous adherence to industry standards and project specifications. High-voltage installation and testing activities were undertaken by specialist operatives working to strict procedures, while containment systems, cable segregation and electrical installations were delivered in accordance with BS 7671 requirements. Earthing and bonding systems were installed and tested to BS 7430 standards, ensuring safe operation across the entire facility.
MII Engineering also provided comprehensive pre-commissioning and commissioning support, including continuity testing, insulation resistance testing, loop checks, point-to-point verification and support throughout energisation and final handover. Each electrical discipline was managed through dedicated inspection and test documentation, providing full traceability from installation through to commissioning and project completion.
Importantly, the project was delivered by a Welsh engineering team supported by a regional supply chain, demonstrating the significant capability that exists within South Wales to support nationally important energy infrastructure projects. The skills deployed on the Hirwaun project, including high-voltage installation, instrumentation, control systems and station earthing, are directly applicable to future developments across the power, hydrogen, nuclear and wider energy transition sectors.
The successful completion of the Hirwaun Power Plant electrical erection package highlights MII Engineering’s ability to deliver large-scale, technically demanding electrical infrastructure projects safely, efficiently and to the highest quality standards. It is another example of the expertise available within the Celtico alliance and the important role Welsh engineering businesses are playing in delivering the UK’s future energy infrastructure.